4 Nov 20267 min read

Delete before we build: challenging every requirement before writing code

How our forward deployed engineers question every requirement, give each a named owner and remove every step they can before building or automating.

Delete before we build: challenging every requirement before writing code

Before our forward deployed engineers build anything, they question every requirement and remove every step, field, integration and report they can. Each requirement has a named owner, and the harder it is to question, for example because it comes from someone senior, the harder we question it. Only what survives the cut is simplified, then sped up, and automated last.

These principles sit at the start of the way of working behind the forward deployed engineer role. This post explains them, where established practice elsewhere echoes them, and why they matter to a business commissioning AI or software work.

What should a requirement start from?

The first principle is to think from first principles. A requirement should start from what the client's business needs. How a task is done today, or what a tool vendor suggests, is evidence, and it is not the requirement itself.

A process can carry steps that made sense once and no longer do. A report someone stopped reading, a field nobody completes or an approval added after a single incident all look like requirements once they are written into a specification.

The UK government's design principles, first published in 2012, make a similar point. "Start with user needs" reminds teams that "what they ask for isn't always what they need." "Do the hard work to make it simple" adds: "Don't take 'It's always been that way' for an answer."

Why does every requirement need a named owner?

Each requirement is tied to a person who can explain why it exists. That gives the engineers someone to ask when the requirement turns out to be harder or costlier than expected.

We question every requirement hard, especially when it comes from someone senior or clever.

Business analysis practice also records where each requirement came from. The International Institute of Business Analysis (IIBA) task cards on requirements life cycle management state: "Traceability identifies the lineage of requirements backwards and forwards." They add that tracing requirements helps a team find inconsistencies and gaps.

In The Thing (1929), G. K. Chesterton argued that nobody should clear away a fence until they know why it was put up. Asking the requirement's owner is how that question gets answered.

Why delete before building?

The third principle is to remove every step, field, integration and report we can. The test is deliberately severe: if nothing ever has to be added back, we did not cut enough. A step that is built has to be tested and maintained for as long as it exists, whether or not anyone needs it.

Martin Fowler's explanation of YAGNI (short for "You Aren't Gonna Need It") sets out that cost. The cost of build is "all the effort spent on analyzing, programming, and testing this now useless feature." The cost of carry follows. Unneeded code adds complexity, which makes the software harder to change and raises the cost of other features.

Predicting which ideas will pay off is hard. In Online Experimentation at Microsoft (2009), Ron Kohavi and colleagues reported that "only about 1/3 of ideas improve the metrics they were designed to improve." Their data came from online services, so it does not measure business systems directly. The finding still echoes the case for making each requirement justify itself.

Which requirements cannot be deleted?

Some requirements exist because of a duty the business cannot remove. Public sector bodies must make their websites and apps meet the WCAG 2.2 AA accessibility standard, under the accessibility requirements for public sector websites and apps. Some steps and records exist to meet a legal duty. Regulated work can require formal traceability of requirements.

The IIBA task cards treat removing a requirement as an approval decision: "Approval is always necessary, whether it is a lightweight step for adaptive initiatives or a rigorous process for complex, predictive initiatives."

When do simplifying, speeding up and automating come in?

Only what survived the cut gets optimised, in that order. AI and automation come last, applied to a process that already works. Once the process is smaller, where AI goes follows the rules in AI-first, never AI-only.

Lean practice also puts removal first. The Lean Enterprise Institute describes ECRS, a questioning sequence in which "E stands for eliminate, C stands for combine, R stands for rearrange, and S stands for simplify." Writing for Gemba Academy, Alen Ganic advises: "do not automate complexity when you have the opportunity to eliminate it."

Outside lean, a similar five-step sequence ending in automation appeared in a 2021 Everyday Astronaut write-up of an interview with Elon Musk.

What does this mean for you as a client?

Expect questions. A supplier working this way will ask who needs each requirement and why, and will propose removing some. Every step removed is a step that never needs building, testing, licensing or support.

Proposing to build less is familiar in UK public sector delivery. The GOV.UK Service Manual's guidance on how the discovery phase works says teams must understand the problem before they commit to building a service. It also says stopping at the end of discovery is not a failure when the research shows that is the right call.

The same questions apply whether the work is an AI agent or bespoke software scoped to what the business needs. Every requirement left in an AI pilot is one more thing to test. The next step is proving what is left with a working prototype at the earliest chance.

Frequently asked questions

What does delete before you build mean?

Removing every step, field, integration and report you can before building anything. If nothing ever needs adding back, not enough was cut.

Why should every requirement have an owner?

So a named person can explain why it exists, and answer questions when it proves hard or costly to build.

When does automation come in?

Last. Only steps that survived the cut are simplified, then sped up, and then automated.

How is deleting a requirement different from prioritising it?

Prioritisation ranks requirements and defers the lowest. In the MoSCoW method, the Won't Have this time category covers work the team has agreed not to deliver in the current timeframe. Deleting removes the requirement altogether.

Do most software features go unused?

The evidence is thinner than the headlines. The Standish Group's CHAOS Manifesto 2013 reports that half of features are hardly ever or never used, but gives no sample or method. A 2010 peer-reviewed study by Eveleens and Verhoef found that Standish's project success and failure figures did not reflect the real projects they examined.