Our forward deployed engineers prove each idea with a working prototype at the earliest chance, never with a slide. Progress is measured in days, and the client sees working software at least once a week. When the client has a decision to make, we build both options with a toggle between them, so they decide by seeing both working.
Documentation follows the prototype and stays tied to something running. These are four of the principles behind the forward deployed engineer way of working. This post explains why they matter to a business buying AI work, what established practice elsewhere says about each, and where a prototype needs care.
Why is a slide the wrong proof?
A slide can show what a system might do. It cannot show whether the system works with your data, your edge cases and the way your team works. Those are the questions that decide whether an AI project succeeds, and they only get answered when something runs.
A prototype also changes the conversation. A working screen invites specific feedback, because people can try it on a real example. That feedback shapes the next week's work. IEEE's Software Engineering Body of Knowledge (SWEBOK v4) puts the benefit this way: "Prototypes can help expose software engineers' assumptions and, where needed, give useful feedback on why they are wrong."
UK government digital teams follow a similar order. The GOV.UK Service Manual page on how the alpha phase works tells them to "Spend alpha building prototypes and testing different ideas." It adds: "A crucial part of alpha is identifying your riskiest assumptions and testing them."
Why do AI projects stall after a proof of concept?
In July 2024, Gartner predicted that at least 30% of generative AI projects would be abandoned after proof of concept by the end of 2025. It gave the reasons as "poor data quality, inadequate risk controls, escalating costs or unclear business value." In June 2025 it forecast that over 40% of agentic AI projects would be cancelled by the end of 2027. Both are forecasts.
RAND's August 2024 report on the root causes of failure for AI projects drew on interviews with 65 experienced data scientists and engineers. Its interviewees named five causes: leadership-driven failures, data problems, chasing new technology, underinvestment in infrastructure and immature technology.
Data problems appear in both sources, and Gartner also names unclear business value. Our analysis of why AI pilots fail in production traces the same gap between a pilot and live use.
How often should you see working software?
The principle is "Fast, fast, fast": progress is measured in days, and working software is shown at least once a week. A weekly demonstration gives the client a regular point to check that the work is heading where they need it to go, and a supplier nowhere to hide if it is not.
Weekly is stricter than the common agile norms. The principles behind the Agile Manifesto state that "Working software is the primary measure of progress". They ask teams to "Deliver working software frequently, from a couple of weeks to a couple of months, with a preference to the shorter timescale." The Scrum Guide 2020 sets sprints at one month or less. It also says: "The Sprint Review is a working session and the Scrum Team should avoid limiting it to a presentation."
A weekly cadence also keeps scope honest. Each week's software either does something useful or it does not, and both outcomes are visible.
Why build both options instead of waiting?
No project should stop because it is waiting on an approval or an answer. Suppose the client must choose between two ways to route an enquiry, or two layouts for staff. We build both options with a toggle to switch between them. The client then decides by seeing both working, with their own examples, and the project keeps moving.
Software engineers call the switch a feature toggle. Pete Hodgson's guide to feature toggles describes Experiment Toggles, which "are used to perform multivariate or A/B testing." He also warns that "Toggles introduce complexity" and that savvy teams treat toggles as inventory with a carrying cost.
Designers have tested a related idea. In a 1996 case study on parallel design, where several versions are built side by side, Nielsen and Faber reported that usability improved by 18% with traditional iterative design and by 70% with parallel design. The same article notes that traditional iterative design is preferable where cost savings matter more than early release.
Why does documentation follow the prototype?
Documentation is short, clear and tied to the prototype, never an abstract design written ahead of it. It leads with flowcharts and screenshots, so the people who will own the system can follow it. Because it describes software that exists, it is easier to check and stays closer to the truth.
The Agile Manifesto sets the same order. It values "Working software over comprehensive documentation" and adds that "while there is value in the items on the right, we value the items on the left more."
What are the limits of a prototype?
A prototype can mislead reviewers. SWEBOK v4 warns that "cosmetic issues or quality problems with the prototype can distract the reviewers' attention from the core underlying functionality."
Quick code also carries a cost. Ward Cunningham, who introduced the idea of technical debt in a 1992 experience report, wrote that "Shipping first time code is like going into debt." He added: "A little debt speeds development so long as it is paid back promptly with a rewrite."
What should you ask an AI supplier?
If you are choosing a supplier for AI work, ask when you will first see something working on your own data. Ask how often you will see progress after that, and what happens while a decision is still open.
Public sector buying guidance points in the same direction. The UK government's guidelines for AI procurement say "Discovery phases or proofs-of-concepts can demonstrate if the AI system is likely to meet your wider requirements." The Digital, Data and Technology Playbook's guidance note on contracting for agile adds: "There is value in incremental developments with outcomes that can be utilised by the customer at the end of each cycle."
A supplier's answers are easier to judge against a wider checklist, and our guide to AI consultancies that build software sets one out. Once a supplier is chosen, the set-up of the pilot decides whether its results mean anything, which is the subject of our guide to running an AI pilot.
Frequently asked questions
Why build a prototype before writing a proposal or design?
A prototype shows whether an idea works with your data and your team. It turns opinions about a slide into feedback on something people can use.
How often should an AI supplier show working software?
Our engineers show working software at least once a week, and measure progress in days.
What if we cannot decide between two approaches?
We build both, with a toggle to switch between them, so you can decide by using both on your own examples while the project keeps moving.
What happens to the option the client did not choose?
It should come out of the code. Pete Hodgson's guide to feature toggles says "a team must be proactive in removing feature flags that are no longer needed", because each toggle adds complexity.
Can a prototype become the finished system?
Not without further work. The GOV.UK Service Manual says the code in a prototype does not need to meet the same standards as production code. Before it goes live, it needs review, testing and any rework those turn up.
If you want to see an idea working before you commit to a larger project, our AI implementation team can help. Request a Quote to start.