22 Oct 20268 min read

The signpost: why every engagement ends with a note on when to call us back

A signpost note tells you when to bring an AI supplier back after handover. What it covers, the events that trigger a call, and how it limits dependency.

The signpost: why every engagement ends with a note on when to call us back

A signpost note is a written note left at the end of a project that tells the client when, and why, to bring the supplier back. Every SpotDev engagement ends with one. It answers the question most handovers leave open.

Alongside it sits a separate note on where else we can help: what we could optimise, improve or replace across the client's stack, and what each change would do for the business. Both are steps in our forward deployed engineer way of working, which runs from understanding the client's business to leaving them able to run what we built.

What is a signpost note?

A signpost note sits beside the handover document and answers a different question.

DocumentQuestion it answers
Handover documentHow does the system work?
Signpost noteWhen and why should we bring the supplier back?
Stack noteWhat else could be optimised, improved or replaced, and what would each change do for the business?

What question do most handovers leave open?

A typical AI project handover document explains how the system works. It rarely answers the question the owner faces a few months later: is this something my team should fix, or is it time to bring someone back?

Without an answer, a client can call the supplier for changes their own people could have made, or wait too long on a change that needed outside help. Both cost money, and the second can cost trust in the system itself.

The question returns for as long as the system runs. The UK Government's AI Playbook (10 Feb 2025) says "Ongoing investment is needed to maintain these systems".

Why should the supplier say when to come back?

A supplier knows where the weak points of a build are, because it made the design decisions behind them. A model chosen for today's volumes, an integration that depends on another system staying the same and a checklist tied to the current way of working are all choices that hold for a while. The people who made them are best placed to say what would make them stop holding.

Writing that down at the end of the project also changes the relationship. The client can see when outside help is worth paying for and when it is not, so the decision to bring us back is theirs.

What events mean it is time to call the supplier back?

Other triggers include:

  • The model provider announces a retirement. Anthropic's model deprecations page commits to "at least 60 days' notice before model retirement for publicly released models". On 30 Sep 2026 it notified developers that Claude Sonnet 4.5 is scheduled to retire from the Claude API on 30 Nov 2026.
  • An API change breaks the code that calls a model. The same page notes: "A new model can reject a deprecated parameter, and a new API version can remove it for every model."
  • Results drift from what the system was built to do, a failure that our guide to monitoring AI systems that fail without crashing shows owners how to spot. The NIST AI Risk Management Framework (January 2023) tells organisations to "supersede, disengage, or deactivate AI systems that demonstrate performance or outcomes inconsistent with intended use."
  • The system reaches the end of its life. The AI Playbook says owners "should also know how to update the system and how to securely close it down at the end of its useful life."

How does a signpost note reduce dependency on the supplier?

Gartner, quoted by The Register in its report on forward deployed engineering (3 Oct 2026), warns that an FDE engagement can leave a client reliant on its vendor. The same report quotes Forrester making a similar point.

UK Government guidance on managing technical lock-in in the cloud names the same cause: "A common cause of technical lock-in is the availability of skills and knowledge."

A written signpost is one answer to that risk. It sits next to another of our steps, getting the client's team to a solid working level with the stack they already run. The people who own the system then decide when it needs help. The National Audit Office's review of government's use of consultants (21 Nov 2025) says knowledge transfer "should be an active process throughout the engagement".

Why is the note on the rest of the stack separate?

A project touches more of a client's systems than the part being changed. Keeping ideas about the rest of the stack in their own note means the client can weigh them later, on their own timetable, apart from the handover of the work they paid for. Stating the business effect of each change lets it be judged on its merits.

What should you ask any supplier before the project ends?

Whoever builds your system, ask how you will know when to call them back, and what they noticed elsewhere in your stack. Ask for both answers in writing. Add them to the other questions on what to ask an AI supplier before you sign. The Cabinet Office Contract Management Playbook (March 2026) says: "If exit is only being considered near contract end, it is too late."

If you are coming to the end of a pilot, our guide to running an AI pilot covers the go or stop decision that comes first.

Frequently asked questions

What is a signpost in an AI project?

A written note left at the end of an engagement. It sets out the reasons and the moments for bringing the supplier back.

When should you call an AI supplier back after a project ends?

When something the build relies on changes, such as a model retirement notice, a connected system changing or results drifting.

What should an AI project handover document include?

It should explain how the system works and how to update it. Gigabit's AI system handover guide warns that "The two that go missing most often are the eval suite and the decision log."

How do you know an AI handover is complete?

The client's team can show that it runs the system. As The National CIO Review puts it, "Knowledge transfer should be demonstrated, not simply declared complete."

Should the handover plan be in the contract?

Yes, where there is a contract. The UK Government's Teal Book says "the contract itself should define the requirements, criteria and mechanisms for handover", and the National Audit Office says "Knowledge transfer arrangements should be built into contracts".

Why do you leave a separate note on the rest of our stack?

So the client can consider other improvements later, when it suits them, and judge each one by its effect on the business.

Does a signpost mean we have to keep paying a supplier?

No. Its purpose is to make the decision to bring a supplier back clear and yours, so you pay for outside help only when it is needed.

To plan a project that has a clear ending from the start, talk to our AI implementation team. Request a Quote to start the conversation.

Written by

John Kelleher

John is the founder and the Chief Executive at SpotDev.