11 Nov 202612 min read

Running a drawing review AI pilot: measuring what the agent catches and what it misses

How to measure a drawing review AI pilot: faults found, false alarms, misses, test set size, parallel running and a pass mark agreed before it starts.

Running a drawing review AI pilot: measuring what the agent catches and what it misses

A drawing review AI pilot should end with two figures measured on your own drawings: the share of known faults the agent found, and the share of its findings your checkers accepted. The pilot also measures what each drawing costs to review. Agree the pass mark, the date and who decides before the pilot starts.

What comes before the pilot?

Our pilots follow a short diagnostic. In it, your senior checkers write down the checklist with us, and we build a test set from past drawings and their review comments. The diagnostic also measures a baseline of review time and of errors found after release, taken from your rework and non-conformance records. Without that baseline, a pilot can show that the agent finds things, but not whether it beats the way you work today.

How do you build the baseline from your own records?

Industry averages are a poor substitute for your own figures. The Get It Right Initiative's literature review on construction rework calls an industry average "almost meaningless" for a specific project. It also notes there "has been little agreement as to a common classification system for recording errors and rework."

The same review separates necessary rework, such as client changes, from unnecessary rework caused by errors. Only the second belongs in a baseline for a checking tool, so take client-driven revisions out before you count. Rework is recorded after the fact, so the baseline window needs drawings old enough for their problems to have surfaced.

Firms working to ISO 19650 may already hold a ready source. UK BIM Framework guidance on ISO 19650-2 says that when a review is unsuccessful, "A record should be made of why the review was unsuccessful plus any amendments that need to be made". Those rejection records can seed both the test set and the baseline.

How does the pilot run?

The pilot builds the drawing review agent for one review stage and runs for about six weeks. For the final weeks it reviews live drawings alongside your checkers, and your process does not change. Nobody relies on its findings during this period. Your checkers carry on as normal, and the agent's report is compared with what they found.

Two of your people take part in the build and leave the pilot able to maintain the checklist and re-test the agent.

Why run the agent in parallel?

UK health guidance on AI describes parallel running. NHS England's lessons from real-world AI evaluations describe a bedding-in period that "can be achieved using parallel running, with old processes continuing as the new technology starts to operate."

The Royal College of Radiologists' AI deployment fundamentals for medical imaging (Nov 2024) calls for evaluating AI "in shadow mode as a standard deployment model for AI". Shadow mode shows what the AI picks up that reporters missed, and what it misses that they found. The college also advises training users "to make their own interpretation first and then to review the AI findings." On drawings, that means checkers finish their own review before they open the agent's report, so their findings stay independent of it.

What counts as a found fault, a false alarm and a miss?

Every outcome in the pilot falls into one of four boxes. The share of known faults found is what machine learning calls recall, and the share of findings accepted is precision.

OutcomeWhat happenedTechnical term
Found faultThe agent reported a fault and your checkers confirmed itTrue positive
False alarmThe agent reported a finding your checkers rejectedFalse positive
MissA known fault the agent did not reportFalse negative
Clean passNo fault was present and the agent reported noneTrue negative

The share of known faults it found

The test set holds faults your checkers found in past drawings. Running the agent against it shows how many of those faults it catches. Every fault it misses, and every one your team finds later, is added to the test set, so the set grows with each review.

A fault caught once should stay caught. Anthropic's engineering guide to evaluating AI agents says regression tests should pass nearly every time, and that tests the agent has mastered graduate into that regression suite. Re-run the whole set after every change to the checklist, the same regression routine used for any AI agent.

The share of its findings your checkers accepted

An agent that flags everything would find every fault and waste your checkers' time. The share of findings they accept shows how much of the agent's output is useful. Each finding is accepted or rejected in the review report, so the figure comes straight from your checkers' own decisions.

Checkers do not always agree with each other either, so some rejections reflect one person's judgement. Measuring how far two checkers agree on the same drawings shows how much of that disagreement to expect.

Neither figure means much alone. A high catch rate with few accepted findings means noise, and a high acceptance rate with a low catch rate means the agent is too cautious.

If a missed fault costs you more than a false alarm, the pass mark can say so. The F-beta score in the scikit-learn documentation gives more weight to recall when beta is above 1. Weighting faults by severity is a choice for your checkers to make, since no standard sets it.

Why is accuracy the wrong figure?

Accuracy counts every correct call, including all the drawings with nothing wrong. When faults are rare, a checker that never flags anything scores well. Google's Machine Learning Crash Course gives the example of a model that always predicts the negative class and scores 99 per cent accuracy "despite being useless". The two pilot figures leave out clean passes, so they cannot be inflated that way.

How many known faults does the test set need?

No standard sets a minimum. A small test set makes the result uncertain, and the size of that uncertainty can be worked out. The NIST/SEMATECH e-Handbook describes the Wilson score interval, a standard way to put a range around a proportion. Worked at 95 per cent confidence, the same 90 per cent catch rate gives these ranges:

Known faults in the test setFaults foundLikely range for the true catch rate
2018About 70 to 97 per cent
5045About 79 to 96 per cent
10090About 83 to 95 per cent

With 20 faults, a 90 per cent result is consistent with an agent that misses three in ten. Against an illustrative pass mark of 80 per cent, only the 100-fault set clears it at the bottom of its range.

A perfect score needs the same care. The rule of three, stated in a 1995 letter in JAMA, covers results with no failures. If none of n cases shows an event, the upper 95 per cent limit for how often it happens is about 3 divided by n. An agent that catches all 30 known faults supports a miss rate below about 10 per cent. It does not show that the agent never misses.

How do you keep the test set honest?

Keep the drawings you score apart from the drawings you tune on. The scikit-learn guide to common pitfalls says "Test data should never be used to make choices about the model." Google's course adds that test sets "wear out" with repeated use.

Live drawings in the parallel run are the freshest test. Google's Rules of Machine Learning advise that you "measure performance of a model on the data gathered after the data you trained the model on".

Include drawings that passed review cleanly. Without them, the set says little about false alarms on drawings that are right. The radiologists' guidance makes the same point, recommending that shadow mode be supplemented with a local set of known positive and negative cases.

Where do drawing review agents tend to struggle?

Large sheets are read in sections because the agent misses more in crowded detail and small print, the same reading limit that shapes checking a BOM against the drawing. The pilot measures what it misses on your own drawings, which tells you more than any general accuracy claim. A sheet it cannot read is flagged for manual checking and never reported as clear.

What do public trials of AI plan review show?

The City of Seattle compared an AI pre-screening tool, CivCheck, with its own staff's review of the same permit applications in a proof of value study from March 2025. Its June 2026 write-up reports completeness checks as 87 per cent accurate and design compliance checks as 92 per cent accurate. Accuracy improved as the tool was recalibrated during the test. The city does not say how accuracy was scored, so those figures do not map onto the two pilot figures above.

Its wider finding does. The city found that "check coverage", detecting all the corrections a staff reviewer would find, "matters as much as accuracy". It added: "Removing a review cycle requires the pre-screening to flag every single correction up front." Compliance checks were harder because of "the thousands of requirements" in the codes.

The US Army Engineer Research and Development Center reports earlier-stage testing. Writing in ASCE's Civil Engineering in November 2026, its authors say testing of their AI review framework "has been limited to documents from previously completed projects rather than active ones". The system marks each check "Yes," "No," or "Needs Review" with a justification and references, and a pilot group of reviewers is assessing accuracy. The authors say results "should be viewed as demonstrations of technical feasibility rather than validation of autonomous engineering review."

How is the go-live decision made?

The go-live decision is taken against the pass mark, the date and the decision-maker agreed before the pilot started. If the agent misses the pass mark, you stop there and keep the written checklist and test set. Your checkers can use both without the agent.

HM Treasury's Magenta Book guidance on test and learn sets the same discipline for government prototypes: "Agree in advance what evidence would justify continuing, adapting or stopping the prototype." Prototypes that do not work "should be stopped, with learning documented for future reference." The UK Government AI Playbook says "you must be clear about what objective measures you're assessing the AI outputs against". One of its case studies made a limited public pilot conditional "provided that accuracy thresholds could be met".

Passing gives the agent no authority over a drawing, and sign-off stays with your engineer. The same structure carries over to AI pilots outside drawing review.

Frequently asked questions

How long is a drawing review AI pilot?

Ours runs for about six weeks after a diagnostic of about three weeks. The agent reviews live drawings alongside your checkers in the final weeks.

How do you measure an AI drawing checker's accuracy?

Measure it on your own drawings: how many known faults it finds, and how many of its findings your checkers judge correct. Plain accuracy flatters an agent when faults are rare.

What happens if the pilot fails?

You stop there. The checklist and test set built during the work stay with you.

How many faults should the test set hold?

No standard sets a number. A result from a small set carries a wide range, so grow the set until the bottom of the range clears your pass mark.

Should checkers see the agent's report before their own review?

No. They finish their own review first so the comparison is fair. Radiology guidance on AI gives the same advice.

Should the test set include drawings with no faults?

Yes. Clean drawings show whether the agent raises findings where there is nothing to find. A set of faulty drawings alone mostly measures what it catches.

If you want to scope a pilot on one of your own review stages, our Claude implementation team can talk it through. Request a Quote to start.

Written by

John Kelleher

John is the founder and the Chief Executive at SpotDev.